Hornsby-Quarry-banner.jpg

Road Improvements – Varna Street, Mount Colah (Full Length)

The proposed works will include construction of kerb and gutter, drainage, pavement improvements and some minor landscaping. The aim of these works is to improve road safety, reduce maintenance, and generally improve the appearance of the residential street.

These road works are listed in Council’s Local Roads Improvement Program and it is proposed to commence the works in August 2022. Once started, the construction works are anticipated to take approximately 8 weeks to complete, weather permitting.

It is expected that the proposed works will cause some temporary inconvenience and disruption to directly affected and nearby residents. The main disruptions are expected to be construction noise; temporary loss of vehicular access to properties; and storage of construction materials and sheds in road reserve. However, appropriate traffic control measures will be implemented, and Council's construction crew will endeavour to keep these temporary inconveniences to a minimum and accommodate specific resident needs and/or requests where possible.

Documents

Enquiries

  • Clint Jones. Ph:9847 4819 (Construction Technical Officer)
  • Wimal Dasanayake Ph 9847 6673 (Construction Engineer)
  • Bala Rajakaruna.: 9847 6881 (Design Engineer)