Hornsby-Quarry-banner.jpg

Road Reconstruction Project Arcadia Road, Galston – Stage 2 works (The Glade to Martin Road)

This project involves road pavement reconstruction, kerb and gutter construction and drainage improvements from The Glade to Martin Road. The aim of these works is to improve road safety and reduce maintenance. It is anticipated that these roadworks will commence on Monday, 31 May 2021 and should be completed by the end of September 2021, weather permitting.

Some minor traffic delays maybe incurred during construction, however, appropriate traffic control measures will be implemented to minimise disruption.

Documents

Enquiries

Campbell Jones Ext: 6679 (Construction Engineer)
Clint Jones. Ext:  4819 (Construction Technical Officer)
Bala Rajakaruna. Ext: 6881 (Design Engineer)
Martin Drake. Ext: 6886 (Design Team Leader)