1. Initial review
An initial review of your application will be undertaken to make sure the application is complete. If the development does not comply and/or it lacks important information, Council will raise any issues or additional information required with the Applicant through the NSW Planning Portal.
2. Notification/advertisement and submissions
Not all development applications are required to be publicly exhibited as per the NSW Government Community Participation Plan (CPP). A list of development types that are excluded from public exhibition are listed in the table below.
Notwithstanding, Council notifies information so that adjoining residents are aware of the proposal and have access to the application documentation. This reflects Council's commitment to keeping the community informed about development occurring within their neighbourhood. Any feedback received may be considered by Council but is not required as part of the assessment process.
For all other development (not listed in the table below) once the Development Application is formally accepted by Council, it will be placed on public exhibition for generally 14 days and can extend to 30 days.
Surrounding residents will be notified in accordance with the NSW Government Community Participation Plan (CPP) and will be provided to opportunity to make a submission about the proposed development. Applications on exhibition are viewable through Application Enquiry. Note: If an application is amended before a determination is made, the changes may require re-notification and be subject to a re-notification fee.
| Development types exlcuded from public exhibition9 |
- Ancillary development to existing residential accommodation (such as but not limited to pools, sheds, pergolas and carports)
- Bed and breakfast accommodation
- Change of use (excluding a change of use to a registered club or pub, and excluding any development that adjoins, or is located on, land in a residential zone)
- Demolition
- Dual occupancy (up to two storeys)
- Attached dwelling (up to 5 dwellings)
- Dwelling house (up to two storeys)
- Multi dwelling housing (up to 5 dwellings)
- Secondary dwelling
- Exhibition home
- Extensive agriculture
- Farm building
- Home business
- Home industry
- Home occupation
- Industrial retail outlet
- Infrastructure facility in the Alpine region10
- Internal and external alterations and additions (excluding residential accommodation)
- Internal and external alterations and additions to existing residential accommodation resulting in no more than two storeys
- Kiosk
- Repair and maintenance of recreation infrastructure, lifting facility, or snow-making infrastructure in the Alpine region
- Roadside stall
- Rural worker's dwelling
- Signage (excluding where it adjoins or is in a residential zone)
- Subdivision of land resulting in no more than 5 new lots
- Subdivision of land that is subject to an existing development consent for its current use
- Temporary structure
- Tree removal on private land
- Applications to modify a development consent made under section 4.55(1) of the EP&A Act
- Applications to modify a development consent made under section 4.55(1A) of the EP&A Act
- Applications to modify a development consent made under section 4.56(1) of the EP&A Act with minimal environmental impact
- Applications to modify a development consent made under section 4.55(2) of the EP&A Act where the development the subject of the consent is specified in this Table.
|
3. Referral
The majority of development applications will require input from specialists within Council, e.g. Tree officer, Building Surveyor, Development Engineer or Environmental Health Officer. If the application is classified as Integrated Development, or involves land associated with a public authority, the application may be forwarded through the NSW Planning Portal to the relevant public authority for comment. The assessment officer will take comments received from referral bodies into consideration when assessing the development application.
4. Assessment
Once the notification period has finished, the assessment officer will commence assessing the development application. The officer will review all plans and supporting documentation, conduct a site inspection, review any submissions made, consider statutory requirements and compliance with relevant planning controls, and complete an assessment report.
5. Determination
The assessment officer will put forward a recommendation to management or the application may be determined by a Planning Panel, depending on its size, complexity, number of submissions received.
6. Outcome
The applicant will receive electronic confirmation of the outcome of the application.