- Application enquiry
- Application services
- Comprehensive local environmental plan
- Hornsby Quarry
- Housing Strategy
- Planning Controls/Studies
- Section 94 Development Contributions
- SEPP 1 Returns
- Works
Hornsby Quarry
HORNSBY QUARRY FILL OPTIONS
GHD report - Review of options for filling Hornsby Quarry - March 2009 (PDF, 2.1mb)
Hornsby quarry legal developmentS
Council to be refunded Hornsby Quarry GST (28 November 2008)
Council wins access to Hornsby Quarry valuation documents (7 November 2008)
SAFETY OF HORNSBY QUARRY AND ENVIRONS
The above two files and audio files of the address can also be downloaded from Bang The Table Mayoral Minute: 11 June 2008: Safety of Hornsby Quarry and Environs HORNSBY QUARRY AND ENVIRONS EXPRESSIONS OF INTEREST Mayoral Minute: 11 June 2008: Quarry Expo Postponed Hornsby Quarry Bang The Table consultation closed at the end of August 2008. Information Night held 30 October 2007 Information Night held 6 November 2007 Hornsby Quarry Documents Hornsby Quarry FAQ 14 April 2005 Twyford Consulting - Information Package Final Published October 2007 Parsons Brinckerhoff - Land capability Study and Master Plan for Hornsby Quarry and Environs Pells Sullivan Meynink Pty Ltd Geotechnical Report Pells Sullivan Meynink Pty Ltd Geotechnical Report - Identifying the geotechnical and hydrogeological constraints relevant to land use options within Hornsby Quarry broken into a series of files. Dr Pells' response to Dr Charles' peer review Copyright Report on public submissions in respect of Hornsby Quarry
Any enquiries relating to the above should be directed to Council's Manager, Design and Construction Branch - phone (02) 9847 6675, or
Verbatim Transcript of Dr Philip Pells' address at Hornsby RSL 21 June 2008 (126kb)
Slides from presentation by Dr Philip Pells of Pells Sullivan Meynink at Hornsby RSL 21 June 2008 (1.4mb)
Expressions of Interest Report to the Community (682kb)
Bang the Table Discussion Forum
Information Session Notes (46kb)
Participant Feedback Summary (14kb)
Deliberative Forum Process - Summary(44kb)
Information Session Notes (78.0kb)
Participant Feedback Summary (14.4kb)
Deliberative Forum Process - Summary (43.9kb)
Tim Robertson Legal Advice
Hornsby Quarry Public Meeting 06 Sept 2006 (77kb)
Hornsby Quarry Information Package Final Oct 2007 (1mb)
Final Land Capability Study (11.87mb)
Land capability study technical volume 1-1 (2.45mb)
Land capability study technical volume 1-2 (14.7mb)
Land capability study technical volume 1-3 (3.54mb)
Land capability study technical volume 1-4 (1.2mb)
Land capability study technical volume 1-5 (3mb)
Land capability study technical volume 1-6 (491kb)
Land capability study technical volume 1-7 (3.56mb)
Land capability study technical volume 1-8 (2.65mb)
Land capability study technical volume 2 Appendices (5.48mb)
Geotech Report S1 - A1 to A7 (1.22mb)
Geotech Report S1 - A1 to A7 images (4.81mb)
Geotech Report S9 (1.79mb)
Geotechnical report peer review undertaken by Dr Charles Gerrard
Geotechnical report (291kb)
Response to Peer Review by PSM (1.53mb)
Hardcopy versions of this report can be viewed at level 2 of Hornsby Council's Administration Building. Further copies are being obtained for each of council's libraries.
The information contained in these documents is the property of Pells Sullivan Meynink Pty Ltd (PSM). Copying of this material in whole or in part without the written permission of PSM constitutes an infringement of copyright laws.
Hornsby Quarry Questions (517kb)
hsc@hornsby.nsw.gov.au

